Concrete
Concrete crews need shoring they can trust. Post shores, frame shoring, aluminum beams, and re-shore posts quantified to your engineer's plan and FL §3107 compliant.
The kit
Post shore spacing follows your engineer of record's design and the slab loading. We supply rated steel shores (up to 10,000 lb) and aluminum beams to span between them.
For elevated slabs, re-shore posts carry green-slab loads back to cured floors below. We quantify to your re-shore plan so levels stay supported.
Florida Building Code §3107 governs shoring and re-shoring. Layouts must come from your engineer of record.
We'll size the job, quote it, and get it on site — same day.
Precios reales. Entrega el mismo día antes de las 2 PM. Igualamos u ofrecemos descuento.
Entrega cotizada por zona · Igualamos u ofrecemos descuento · Hablamos Español